Get a Free Estimate

Enter your plot details, choose your package, and get a complete cost breakdown in under 2 minutes.

1
Plot Area
2
Floors
3
Package
4
Extras
✓
Report
Step 1 of 4 — Plot Area 0%
🏠

Enter Your Plot & Built-up Area

Provide your plot size and the construction area per floor

— Sq. Feet
— Sq. Yards
— Cents
Built-up Area
— Sq. Feet
— Sq. Yards
— Cents
Car Parking Area (Optional)
— Sq. Feet
— Cars (Approx)
— Est. Cost
ℹ Minimum single car bay = 200 sqft. Leave blank if no parking needed.
🏛

How Many Floors Will You Build?

Each additional floor adds approximately 4 months to the timeline

🏠

Selected

Ground Floor Only
1 Floor Total
🌟

Select Your Construction Package

All rates include materials, labour, and site supervision

● ● Selected Package
—
Base Rate
—
All-inclusive — Labour + Materials
Estimated Total —
🕑 —
What’s Included
➕

Any Extra Requirements?

These add-ons are calculated on top of the base construction estimate

Add-ons Total ₹0
Total Estimated Construction Cost — Chennai 2026
₹0
—
Base Unit Rate
—
Total Built-up Area
—
Plot Area
—
Configuration
Estimated Construction Duration
—
0m4m8m 12m16m20m24m
🏠
—
Base Cost
➕
—
Add-ons
💳
—
EMI @ 7.1%, 20yr
🕑
—
Monthly Outflow
Cost Distribution by Phase
Phase Breakdown
All Packages — Side by Side
Complete Cost Estimate Sheet % Share Estimated Amount
⚠ Disclaimer: All figures are approximate estimates for Chennai metro (2026). Actual costs depend on site conditions, soil type, material price fluctuations, and contractor negotiations. Government approval charges, architect fees, EB/water connection charges, and interior furnishing are excluded. Sump and overhead tank rates vary by selected package.

Ready to Build Your Home?

Share this estimate with our team and we will get back to you within 24 hours.